The 25mm thick large steel tube is pushed With all the end shut by a metal shoe. On reaching the required driving resistance, a full duration cage is lowered in on the tube and full of significant slump concrete. The tube is then vibrated out leaving a shaft of concrete. https://castinsitupiles21973.collectblogs.com/77683652/the-smart-trick-of-cast-in-situ-piles-that-no-one-is-discussing